Close Menu
Best in Gaming
  • Home
  • News
  • PC Games
  • PlayStation
  • Xbox
  • Nintendo
  • Mobile
  • Editor’s Picks
  • Press Release
What's On
Grand Theft Auto 6 is Trolling Players in the Best Way Possible

Grand Theft Auto 6 is Trolling Players in the Best Way Possible

23 November 2026
Somehow, Jensen Huang Returned

Somehow, Jensen Huang Returned

23 November 2026
New Super Mario 64 Mixed-Reality Port Lets You Pinch Mario Onto Your Palm, but There’s a Catch

New Super Mario 64 Mixed-Reality Port Lets You Pinch Mario Onto Your Palm, but There’s a Catch

23 November 2026
This Terrifying GTA 6 Easter Egg Will Give You Nightmares

This Terrifying GTA 6 Easter Egg Will Give You Nightmares

23 November 2026
GTA 6 Has A Super Mario Bros. Easter Egg, And It’s A Trip

GTA 6 Has A Super Mario Bros. Easter Egg, And It’s A Trip

23 November 2026
Facebook X (Twitter) Instagram
Best in Gaming
  • Home
  • News
  • PC Games
  • PlayStation
  • Xbox
  • Nintendo
  • Mobile
  • Editor’s Picks
  • Press Release
Best in Gaming
Home » Complete Apex Legends Season 31 + Crypto Rework Breakdown
PlayStation

Complete Apex Legends Season 31 + Crypto Rework Breakdown

News RoomBy News Room29 October 20264 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Complete Apex Legends Season 31 + Crypto Rework Breakdown

Apex Legends Season 31: Cipher is bringing some major changes to the popular battle royale game, including a complete rework of Crypto, buffs to Revenant and Lifeline, and a new way to use one of the game’s most popular weapons. Apex Legends Season 31 launches on November 3 at 10 AM PT/1 PM ET.

Crypto is getting the most significant changes, but Revenant and Lifeline are receiving some noteworthy improvements of their own. Meanwhile, the Wingman is getting an entirely new firing option, and Strongholds are being introduced as another way for squads to fight over valuable loot. There’s quite a bit happening here, with several of these additions potentially changing how players approach their favorite characters in Apex Legends.

EA Confirms New DICE and Respawn Game Rumored to Be Star Wars Battlefront 3

Electronic Arts confirms a new game in development from DICE and Respawn, and rumors claim that it’s the long-awaited Star Wars Battlefront 3.

Apex Legends Season 31 List of Changes (Including Crypto’s Rework)

Crypto is receiving a major rework in Apex Legends, with Respawn making some fundamental changes to his Surveillance Drone and EMP Ultimate. The goal is to make Crypto a more aggressive Legend, allowing him to gather information without spending as much time sitting back and controlling his drone.

  • His drone’s new Sentry Mode will automatically tag enemies in its line of sight, sharing that information with teammates.
  • The drone now operates on batteries instead of the previous cooldown-based system, allowing players to retrieve and redeploy it without lengthy waits.
  • Crypto can now activate his EMP Ultimate with a single button press, making it easier to use during combat.

ChronoLogic

Rearrange the movies into the correct US release order.







Sign in to claim your place on
the leaderboard!




Results

—

—

—


Sign in to claim your place on
the leaderboard!


No scores yet. Be the first.

No scores yet. Be the first.

Revenant and Lifeline are also getting some love this season. Revenant’s Tactical and Ultimate abilities are receiving shorter cooldowns, while his new upgrades allow players to extend his Ultimate with every knockdown, silence enemies after using Shadow Pounce, or automatically refresh Shadow Pounce when an enemy is marked. Lifeline, meanwhile, will have a shorter cooldown on her D.O.C. healing drone and can now heal herself while gliding. Her upgrades include improved flight mobility, a reduced Ultimate cooldown, and the return of Lifeline’s Revive Shield.

Beyond the character changes, Apex Legends Season 31 is introducing the Akimbo Wingman. The Wingman has traditionally rewarded precision and accurate shooting, but the new option brings additional burst-fire potential to the revolver (and a pretty substantial change to how it can be used). Strongholds are another major addition, essentially expanding on the concept of IMC Armories by giving players high-risk locations to raid for valuable loot. These contain crate weapons, corrupted attachments, and EVO for the entire squad, but there’s a catch: opening a Stronghold takes time and triggers an alarm.


Complete Apex Legends Season 31 + Crypto Rework Breakdown


BioWare Co-Founder Weighs In On Studio’s Closure


#SaveMassEffect Petition Appears on Billboard in Times Square


Former BioWare Dev Reveals More About the Mass Effect Game That Never Happened







There’s plenty more coming to Apex Legends Season 31, but the changes to Crypto, Revenant, and Lifeline are likely to be among the most immediately noticeable. Ultimately, Season 31 looks to be another significant shake-up for the popular BR, with Respawn continuing to revisit older mechanics and bringing out the most of its existing Apex Legends roster instead of relying entirely on new content.


Apex Legends Tag Page Cover Art


Released

February 4, 2019

ESRB

Teen / Blood, Violence, Users Interact, In-Game Purchases (Includes Random Items)

Publisher(s)

Electronic Arts


Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related News

GTA 6 Players Are Getting Banned from PSN for Sharing Screenshots

GTA 6 Players Are Getting Banned from PSN for Sharing Screenshots

23 November 2026
All GTA 6 Players Should Do This After Completing Chapter 1

All GTA 6 Players Should Do This After Completing Chapter 1

23 November 2026
New PS Plus Extra Game for December 2026 Officially Announced Early

New PS Plus Extra Game for December 2026 Officially Announced Early

23 November 2026
PS5 Game is Shutting Down Forever on Wednesday

PS5 Game is Shutting Down Forever on Wednesday

22 November 2026
Editors Picks
Somehow, Jensen Huang Returned

Somehow, Jensen Huang Returned

23 November 2026
New Super Mario 64 Mixed-Reality Port Lets You Pinch Mario Onto Your Palm, but There’s a Catch

New Super Mario 64 Mixed-Reality Port Lets You Pinch Mario Onto Your Palm, but There’s a Catch

23 November 2026
This Terrifying GTA 6 Easter Egg Will Give You Nightmares

This Terrifying GTA 6 Easter Egg Will Give You Nightmares

23 November 2026
GTA 6 Has A Super Mario Bros. Easter Egg, And It’s A Trip

GTA 6 Has A Super Mario Bros. Easter Egg, And It’s A Trip

23 November 2026
Top Articles
GTA 6 Online Could Be Bigger Than Fortnite, Bank Of America Stock Analyst Says News

GTA 6 Online Could Be Bigger Than Fortnite, Bank Of America Stock Analyst Says

By News Room
GTA 6 Players Figure Out A Way To Remove Its Framerate Cap, But 60FPS Ain’t Happening Anytime Soon News

GTA 6 Players Figure Out A Way To Remove Its Framerate Cap, But 60FPS Ain’t Happening Anytime Soon

By News Room
GTA 6 Players Are Getting Banned from PSN for Sharing Screenshots PlayStation

GTA 6 Players Are Getting Banned from PSN for Sharing Screenshots

By News Room
Best in Gaming
Facebook X (Twitter) Instagram Pinterest Vimeo YouTube
  • Privacy Policy
  • Terms of use
  • Advertise
  • Contact Us
© 2026 Best in Gaming. All Rights Reserved.

Type above and press Enter to search. Press Esc to cancel.